The accotink gravity sewer improvements project. The accotink gravity sewer is proposed to run the entire length of the hunters branch tributary from nottoway park to the junction with accotink creek and the cross county trail in eakin park It would install an entirely new sewer line parallel to the multiple existing lines The damage to the woods and wetlands along hunters branch will be extensive 2.3 miles of tree loss and disrupted. The accotink gravity sewer improvements project is issued by the department of public works and environmental services of fairfax county, virginia
The project aims to enhance the wastewater infrastructure in the region, ensuring efficient sewage management and environmental protection. Doing business | public works and environmental services (fairfaxcounty.gov) Sealed bids are hereby solicited for the construction of the accotink gravity sewer improvements This is a lump sum price contract Or pecimen of the native vine yellow passionf er “the accotink sewer line is one of the most critical pieces of infrastructure in fairfax and sak was able to work with dewberry and the county to ensure completion of a successful cipp rehabilitation project,” said paul longo, project engineer, dewberry water and wastewater services.
The project encompasses approximately 15,000 linear feet of new interceptor sewer utilizing both open cut and trenchless construction methods, along with various. Fairfax county proposes to replace aging sewer infrastructure from nottoway park in vienna to the accotink trail below route 50. This project aims to enhance the sewerage capacity in anticipation of future growth in the northeast portion of fairfax county.
OPEN