One half of the cleat is already attached to the back of the everbright, and the other must be attached to the wall by your facilities person or contractor using the positioning on the installation diagram. Fasten miter base rail to nailer(s) through base rail slots with provided fasteners. Fasten to panel u ing recomm apply caulk to top of zee closure and attach headwall flashing using recommended fasteners. 3 finish installation once you are ready to start laying your drain, position the channel into the concrete slurry or compacted sand so that the feet of the channel are completely immersed. 1.1 scope and applicability this der technical interconnection and interoperability requirements (tiir) document specifies the technical requirements for the interconnection of distributed energy resources (ders) to aep’s system in several der interconnection scenarios as shown in table 1 below In some scenarios, other transmission or rto requirements may apply in addition to the.
OPEN