This allows the facility owner the ability to populate their facility maintenance system quickly and accurately with the data needed. Learn what cobie means in bim and why it's crucial in 2025 for digital handovers, facility management, and smart building operations Discover how structured data drives efficiency and sustainability in modern construction. Cobie is a data format used in bim projects to capture and exchange essential project information This article provides a systematic explanation of the purpose, origin and evolution, data structure, delivery formats, application scenarios, and future trends of the cobie standard—revealing how it bridges the critical gap between bim and facilities management. Cobie stands for the construction operations building information exchange, and it is an international standard that relates to the exchange of building information
It is most commonly used in the product data handover from the construction team to the operations team. Cobie 2.4 content this document details the latest version of cobie, version 3 It includes information related to The process of using cobie, overall and for different project types the structure of the cobie specification the definitions of the schemas related to cobie (appendix) a log of the changes from the previous version 2.4 (appendix) The maintainable assets of a facility for cobie are those items that the owner of a facility will manage in an operations & maintenance system They can include mechanical equipment, electrical equipment, plumbing fixtures, and other items that require maintenance, upkeep, and replacement.
OPEN